Tuesday, July 8, 2014

The Dramatic Project

Leading to furniture shop in Phnom Penh construction materials highlighted, the project is designed as internalized single storey extension and the clients brief. One more thing the project is designed with a dramatic double height space with a central courtyard. By this way it is used the large stacked concrete pipes for the street façade of the addition a good combination for many reasons. In this case it has a depth and can be interactive, has a dramatic, sculptural, quality, reference existing internal circular motifs and it suggested stacked kegs. Moreover much of the steel structure is exposed and the concrete finish of the pipes and precast form the base of the indoor palette of materials

No comments:

Post a Comment